Reduced Operations During Harvard Winter Recess

The SBDB will be operating at a reduced level between Dec 26 2025 and Jan 1 2026 due to Harvard Winter Recess. Deposition credential requests and dataset release requests during this time will be handled following this time period.

Datasets Related to Structure 5HV0




X-Ray Diffraction data from Bacillus anthracis Prolyl 4-hydroxylase in complex with Cd(II) and AKG, source of 5HV0 structure

High resolution dataset with Cd(II) in space group P3