Reduced Operations During Harvard Winter Recess

The SBDB will be operating at a reduced level between Dec 26 2025 and Jan 1 2026 due to Harvard Winter Recess. Deposition credential requests and dataset release requests during this time will be handled following this time period.

Datasets Related to Structure 7RA9




X-Ray Diffraction data from engineered stabIL-2 seq1, source of 7RA9 structure

native dataset