Reduced Operations During Harvard Winter Recess

The SBDB will be operating at a reduced level between Dec 26 2025 and Jan 1 2026 due to Harvard Winter Recess. Deposition credential requests and dataset release requests during this time will be handled following this time period.

Datasets Related to Structure 6TL1




X-Ray Diffraction data from TASOR pseudo-PARP domain, source of 6TL1 structure

Native and Se-Met derivative data used for SAD structure determination.